SOLICITATION NOTICE
Z -- Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
- Notice Date
- 9/17/2026 10:49:18 AM
- Notice Type
- Solicitation
- NAICS
- 236210
— Industrial Building Construction
- Contracting Office
- FERMILAB - DOE CONTRACTOR Batavia IL 60510 USA
- ZIP Code
- 60510
- Solicitation Number
- RFP-376508-CD
- Response Due
- 11/17/2026 2:00:00 PM
- Archive Date
- 12/02/2026
- Point of Contact
- Chris Daley, Phone: 6308404256
- E-Mail Address
-
cdaley@fnal.gov
(cdaley@fnal.gov)
- Small Business Set-Aside
- NONE No Set aside used
- Description
- This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab�s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab�s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 � Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 � 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 � 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 � 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 � 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/b3e96254b8dc47f48e58f2821e5100ad/view)
- Place of Performance
- Address: Batavia, IL 60510, USA
- Zip Code: 60510
- Country: USA
- Zip Code: 60510
- Record
- SN07975106-F 20260919/260917230051 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |