SOLICITATION NOTICE

Z -- Asbestos Abatement � Building 801, VA Augusta Health Care System

Notice Date
9/17/2026 4:33:56 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
247-NETWORK CONTRACT OFFICE 7 (36C247) AUGUSTA GA 30904 USA
 
ZIP Code
30904
 
Solicitation Number
36C24726Q0749
 
Response Due
9/24/2026 1:00:00 PM
 
Archive Date
10/09/2026
 
Point of Contact
Pamela R Moffitt
 
E-Mail Address
pamela.moffitt@va.gov
(pamela.moffitt@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Description
Amendment 002 Project 509-26-120 Asbestos Abatement � Building 801 Rooms: 6B-102, 6B-103, 6B-104, 5B-102, and 5B-103 Purpose: This amendment publishes the Government�s responses to vendor Requests for Information (RFIs). No other changes are made to the solicitation at this time. RFIs AND RESPONSES: The following RFIs were submitted by vendors. The Government�s responses are provided below. Will the project be done in Phases or will we have access to the entire area at once? The project may be carried out in incremental or informal phases. For example, abatement could be completed on the 5th floor and, at a separate time, on the 6th floor. What is the government estimate range for this project? Magnitude of Construction Between $25,000 and $100,000 Who will disconnect the sinks? The VA Engineering Shops Are we capping sink lines back in the wall? VA Engineering Shops will perform this task. Will we be required to replace ceiling tile and grid when we remove the exhaust hoods? VA will provide the replacement ceiling tiles Are there windows to allow us to Exhaust outside during abatement? Yes, the COR will work with the contractor to coordinate with other departments to schedule any temporary closures for access to these windows. What type of flooring materials are you providing (LVT, CPT, Tile, ETC) LVT Are we assuming the substrate does not require any repair? yes Are all of the wall gypsum board mounted onto a steel stud wall? yes Is there fire detection equipment in the exhaust hoods that will need to be disarmed and removed prior to demolition. If so, will the VA take care of this? No, there is no fire detection equipment in the exhaust hood and all utilities shutdowns, termination/ disconnection (e.g. power, med gases, etc.) will be performed by the VA Are we removing countertops and cabinets? If so, can you give a linear foot of amount of cabinets and countertops to be removed. Yes, the Clean Demo (without asbestos) will include both Wall and base cabinets and countertops. The following are the approximate Linear footage of each: 5B 102: �21 LF Wall Cabinets / �51 LF Base Cabinets / � 51 LF Countertops 5B 103: � 9 LF Wall Cabinets/ � 9 LF Base Cabinets / � 9 LF Countertops 6B 102: � 9 LF Wall Cabinets/ � 12 LF Base Cabinets / � 16 LF Countertops 6B 103: � 10 LF Wall Cabinets/ � 10 LF Countertops 6B 104: None How many drying racks are being removed from the wall? 1 Beaker drying rack located in Rm #6B 102 How many exhaust hoods are being removed? 1 exhaust hood in Rm #6B 102 Is there any electrical work? No
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/9764ee4c2c14423783851d8c596e9159/view)
 
Place of Performance
Address: Augusta, GA, USA
Country: USA
 
Record
SN07975064-F 20260919/260917230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.