Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF SEPTEMBER 19, 2026 SAM #9063
AWARD

Y -- Accelerated Design-Build to Budget Construct Barracks, Multi-Use Training Facility, Galley & Firehouse at USCG TRACEN Cape May, Cape May, NJ

Notice Date
9/17/2026 1:52:13 PM
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
FDCC(00047) NORFOLK VA 23513 USA
 
ZIP Code
23513
 
Solicitation Number
70Z04726RPCNI0006
 
Archive Date
12/31/2026
 
Point of Contact
Maria (Helen) Chapa-Johnson, Phone: 2068153535, Sharan A. Lind, Phone: 5716074595
 
E-Mail Address
maria.e.chapa-johnson@uscg.mil, Sharan.A.Lind@uscg.mil
(maria.e.chapa-johnson@uscg.mil, Sharan.A.Lind@uscg.mil)
 
Small Business Set-Aside
NONE No Set aside used
 
Award Number
70Z04723DPCNI0006
 
Award Date
04/29/2026
 
Awardee
WHITING-TURNER CONTRACTING COMPANY, THE Baltimore MD 21286 USA
 
Award Amount
400000000.00
 
Description
The project will be to Design/Build new facilities at TRACEN Cape May, NJ. The scope of work includes but is not limited to construction of barracks buildings to accommodate an annual capacity of 5,600 recruits. It is a critical and non-negotiable requirement that the annual operational capacity of TRACEN Cape May be maintained without interruption for the entire duration of the construction project. Therefore, all construction efforts must be planned and executed in a manner that ensures no reduction in the annual number of recruits processed. The continuity of operations is a paramount objective of this project. While the RFP drawings indicate the construction of four barracks buildings, the Designer of Record is granted the flexibility to modify this number. The ultimate number of buildings is secondary to achieving the essential operational throughput. This approach allows for potential design optimizations and innovative solutions, provided the core mission-critical requirement of recruit accommodation capacity is fully satisfied. The scope of work includes but is not limited to; demolition and disposal of abandoned steam trenches, buildings and building old foundations, relocation of electrical duct banks and salvaging of transformers, temporary office trailer setup, construction of new VIP review stand, grandstands with cantilevered shading and new parade path. During construction of the new barracks a minimum of 3 barracks buildings must remain operational at all times. This project can be delivered in phases. However, the construction phases outlined here will occur only after the Base Item 0001 process is awarded and finalized. Proposed phasing is as follows: During phase 1, the existing MCPOCG (Bldg. 911) can be demolished and two temporary office trailers will be provided complete with water, sewer, electrical and C5IT connections. Two new barracks buildings can be constructed. Then James and Healy Halls can be demolished. Phase 2 will require construction of all remaining barracks facilities. In addition to the remaining barracks facilities, construction of several facilities is required in order of precedence: 1.Multi-purpose training facility (~80,000GSF) 2.Galley or expansion of existing galley to meet future throughput requirements. (~35,000GSF) 3.Fire station (~20,000GSF) The firehouse must have a natural gas generator and automatic transfer switch meeting the requirements of NFPA 70, Article 701, Legally Required Standby Systems. The generator shall be sized to power all the loads within the entire building. The UPS shall power all loads associated with emergency services. Emergency services loads include, but are not limited to: radio communication system, emergency response system, fire alarm front end, burglar alarm front end, all communication equipment, etc. Note: See Attachment H Prior to demolition of existing galley and fire station, the new facilities will need to be constructed. All facilities are required to be sustainable in accordance with the Council on Environmental Quality (CEQ) Guiding Principles for Federal Buildings, Dec 2020. All facilities shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a �whole building� integrated design approach, as well as comply with ENERGY STAR standards. The final phasing of these additional facilities will have to be determined by the Designer of Record (DOR) in coordination with the TRACEN Cape May Facility Engineering office. See site civil drawings.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/bdcf17c9431b4c1ebceb8532e11bd2e3/view)
 
Place of Performance
Address: Cape May, NJ 08204, USA
Zip Code: 08204
Country: USA
 
Record
SN07974165-F 20260919/260917230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.