Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF SEPTEMBER 17, 2026 SAM #9061
SOLICITATION NOTICE

Y -- AZ BL COLO 7528(1) Burro Creek Road

Notice Date
9/15/2026 9:59:26 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF27B000002
 
Response Due
9/30/2026 1:00:00 PM
 
Archive Date
10/15/2026
 
Point of Contact
Eric Grosskreuz, Kelly Palmer
 
E-Mail Address
cflcontracts@dot.gov, CFLcontracts@dot.gov
(cflcontracts@dot.gov, CFLcontracts@dot.gov)
 
Small Business Set-Aside
SBA Small Business Set Aside - Total
 
Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Burro Creek Road PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement � October 2026 Award-January - 2027 Construction � January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/04633d3deaa74bd9856924934d466a6d/view)
 
Place of Performance
Address: Kingman, AZ 86401, USA
Zip Code: 86401
Country: USA
 
Record
SN07971271-F 20260917/260915230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.