Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF SEPTEMBER 13, 2026 SAM #9057
AWARD

Z -- Award Notice - MOUTH OF THE COLUMBIA RIVER - NORTH JETTY MAJOR MAINTENANCE - PHASE II -

Notice Date
9/11/2026 12:00:00 AM
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST PORTLAND PORTLAND OR 97204-3495 USA
 
ZIP Code
97204-3495
 
Solicitation Number
W9127N26CA033
 
Archive Date
09/26/2026
 
Point of Contact
David Cook, Justin F Figueredo
 
E-Mail Address
david.m.cook@usace.army.mil, justin.f.figueredo@usace.army.mil
(david.m.cook@usace.army.mil, justin.f.figueredo@usace.army.mil)
 
Small Business Set-Aside
NONE No Set aside used
 
Award Number
W9127N26CA033
 
Award Date
09/11/2026
 
Awardee
ORION GOVERNMENT SERVICES LLC Houston TX 77020 USA
 
Award Amount
26727470.00
 
Description
This award announcement is for the North Jetty Major Maintenance � Phase II, Klickitat County, Washington. The MCR federal navigation project is situated at the border between Washington and Oregon, where the Columbia River meets the Pacific Ocean. Deep-draft navigation through the MCR is facilitated by three primary navigation structures-North Jetty, South Jetty, and Jetty A-with a combined authorized length of 10.2 miles. The North Jetty has an authorized length of 2.5 miles extending to Station 130+00; however, it has not been constructed to its full authorized length. The initial construction of the North Jetty concluded at approximately Station 122+00, resulting in a constructed length of approximately 2.3 miles. This jetty was the second of the three to be constructed and was completed in 1917. Subsequent repairs and rehabilitations along various sections of the North Jetty were carried out in 1939, 1965, 2005, 2015, and 2019. Both initial construction and repairs utilized stone with a minimum density ranging from 167 to 180 pounds per cubic foot (pd). The side slopes of the jetty vary between 1:1.25 and 1:2 (vertical: horizontal), with an average crest elevation of 25 ft msl. Since construction, a total of 3,569,030 tons of armor stone have been placed. The Mouth of the Columbia River (MCR) North Jetty is located at the southwest corner of Washington State near Ilwaco, WA. Access to the north jetty is from N Head Rd and Cape Disappointment State Park. Mandatory work for MCR North Jetty Expedited Repairs includes toe, side slope, and crest repair construction above -5 feet NAVD88 elevation along approximately 900 feet of the jetty trunk primarily on the ocean side. These sections will be repaired and reconstructed to a design crest width of 30 feet, side slopes of 1V:2H and a crest elevation of +24.5 feet NAVD88. The estimated stone volume required for the repairs is approximately 11,100 cubic yards with an approximate minimum stone densities of 185 pounds per cubic foot. Expected stone size is between 20-40 tons each. A jetty crest haul road on top of the jetty must be constructed and staging area developed to store the large quantity of jetty armor stone.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/476fc49c33aa41a395986a88d609da41/view)
 
Place of Performance
Address: Ilwaco, WA 98624, USA
Zip Code: 98624
Country: USA
 
Record
SN07966834-F 20260913/260911230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.