Y -- NRM-CONST 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear

Notice Date
5/19/2026 8:36:59 AM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24226B0042
 
Response Due
5/26/2026 9:00:00 AM
 
Archive Date
06/25/2026
 
Point of Contact
Kimberly A Gomez (Contractor), Contract Specialist
 
E-Mail Address
Kimberly.Gomez@va.gov
(Kimberly.Gomez@va.gov)
 
Awardee
null
 
Description
60. RFI #18 states: Please provide hazardous materials survey information for asbestos, lead paint, refrigerants, contaminated oil, and other regulated materials in demolition areas. VA Response states: Hazardous sampling and abatement are required. GC to provide abatement service, A/E to provide Air Monitoring service Since there are no drawings or specifications, please clarify in detail the scope of work for the abatement service, including the quantities for hazardous sampling and abatement. Also, identify the work on drawings. This will help the contractor/GC provide a fair and reasonable price to the government. Updated VA Response: Please be advised that no pre demolition hazardous materials survey has been performed for asbestos, etc. Accordingly, each bidder shall include a reasonable allowance based on construction perimeter or square foot in their bid for all necessary hazardous materials survey, sampling, testing, and abatement services required to complete the work in compliance with applicable codes and regulations. This allowance shall cover, at a minimum, the costs for engaging qualified environmental consultants conducting field investigations and sampling, laboratory analysis, and performing any required abatement, removal, handling, and proper disposal of identified hazardous/regulated materials encountered within the demolition and construction areas. The contractor remains responsible for confirming the adequacy of the allowance and for executing all required hazardous materials work in accordance with governing federal standards. Any adjustments to the allowance, if warranted based on actual conditions, will be addressed in accordance with the contract s provisions for changes.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/7e1c1990385a4f3ba2cf6c3174bb6004/view)
 
Record
SN07821202-F 20260521/260519230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.