Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 20, 2026 SAM #8941
SOLICITATION NOTICE

Y -- NRCS-WV Ohio County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road

Notice Date
5/18/2026 1:18:13 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
FPAC BUS CNTR-ACQ DIV WASHINGTON DC 20250 USA
 
ZIP Code
20250
 
Solicitation Number
12FPC326B0010
 
Response Due
6/17/2026 10:00:00 AM
 
Archive Date
07/02/2026
 
Point of Contact
Mark Domingo
 
E-Mail Address
mark.domingo@usda.gov
(mark.domingo@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Please see attachments and comibined synopsis solicitaiton for further deatails. Ohio County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV. The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor�s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/519cfce419df42a9b4b175f420f25f00/view)
 
Place of Performance
Address: WV, USA
Country: USA
 
Record
SN07819370-F 20260520/260519000156 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.