Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 20, 2026 SAM #8941
SOLICITATION NOTICE

J -- Repair services for the AEWS program, NSN 6130012091573 QX; 0670

Notice Date
5/18/2026 1:27:52 PM
 
Notice Type
Solicitation
 
NAICS
811210 —
 
Contracting Office
FA8250 AFSC PZAAA HILL AFB UT 84056-5825 USA
 
ZIP Code
84056-5825
 
Solicitation Number
FA825026Q0670
 
Response Due
6/9/2026 3:00:00 PM
 
Archive Date
06/24/2026
 
Point of Contact
Elijah Leo Carino, Valerie Humphries, Phone: 801-775-6455
 
E-Mail Address
elijah_leo.carino@us.af.mil, valerie.humphries@us.af.mil
(elijah_leo.carino@us.af.mil, valerie.humphries@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Please review the Performance Work Statement (PWS) for details. ****The contractor is required to have a CMMC Level 2 (SELF) to be consider The Requirement is not an inherently government function. Repair effort is deemed performance based. Critical Safety Item (CSI) does not apply to this PI. Requirement restricted to qualified source(s). All non-qualified vendors that submit a proposal in support of this requirement must comply with qualification requirements found in clause 52.209-1, and the source qualification statement attached hereto, in order to be considered for award. Award shall not be delayed to qualify new sources. For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation. Work consists of one of two efforts: Test, teardown, and evaluation (TT&E) only or TT&E and repair.NSN: Item Description: POWER SUPPLY Part Number: 7326396G002 Quantity: 17 EA RFQ/RFP Return Date: Copy Note: ***RESTRICTED TO PREQUALIFIED SOURCES***Qualification Requirements: See FAR Part 52.209-1 The requirements of FAR 9.202(a) apply. Sources must be qualified prior to being considered for award. Interested vendors that have not been previously approved for this acquisition must submit a Source Approval Request (SAR) package to the Source Development Small Business Office or the Contracting Officer. As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification in the attached Repair Qualification Requirements (section C document). If requesting access to the technical data package (TDP), please email elijah_leo.carino@us.af.mil with a current copy of your DD2345 and JCP printout. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). An alternate source must qualify in accordance with the design control activity's procedures as approved by the cognizant Government engineering activity. ABOVE CLIN 0001 ACO AUTHORITY AND RESPONSIBILITIES: 1) All applicable contract admin functions as outlined in FAR 42.302(a) and DFARS 242.302(a) 2) Extend the delivery schedule as required and take consideration if deemed necessary. 3) Initiate close out when actions required in paragraph 4) are completed. 4) ACO is to verify Commercial Asset Visibility Air Force (CAVAF) inputs have been made before authorizing payment on the contract. Inputs can be verified by emailing 415SCMS.PMS.Contract@us.af.mil 5) ACO is authorized to take consideration from the contractor for failure to comply with CAVAF inputs. In the case of a Beyond Economical Repair (BER) determination, DCMA QAR shall request disposition instructions and/or condemnation approvals from the cognizant USAF Program Manager or customer, and supply disposition/condemnation instructions to the contractor. Upon completion of CLIN 0001 a detailed repair quote, to include, at a minimum, labor hours, labor categories, profit and materials, shall be forwarded to the PCO. The PCO will negotiate and modify the contract to provide the negotiated funds for the repair. Work shall not begin under CLIN 0002 until notice to proceed is provided from the PCO in the form of a modification. 0001 Test, Teardown, and Evaluation (TT&E) 0003 Commercial Asset Visibility Air Force (CAVAF) Data Item No. A001, A002, A003 0004 Repairable Item Inspection Report (RIIR) Data Item No. B001 0005 Counterfeit Prevention Plan (CPP) Data Item No. C001 0006 Engineering Change Proposal (ECP) Data Item No. D001 0007 Test Procedure Data Item No. E001 0008 Test Report Data Item No. F001
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/43ec69628c41462d815b7ef268094973/view)
 
Record
SN07819162-F 20260520/260519000154 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.