SOLICITATION NOTICE
J -- Dry-Dock: USCG STA SAN FRANCISCO (45770) FY26 DD
- Notice Date
- 3/17/2026 6:35:49 AM
- Notice Type
- Solicitation
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- SFLC PROCUREMENT BRANCH 3(00040) BALTIMORE MD 21226 USA
- ZIP Code
- 21226
- Solicitation Number
- 70Z04026QSBPL0005
- Response Due
- 3/26/2026 11:00:00 AM
- Archive Date
- 04/10/2026
- Point of Contact
- Regina M Elliott-Dougherty, Phone: 5716101960, Janet M Delaney, Phone: 5716076322
- E-Mail Address
-
Regina.ElliottDougherty@uscg.mil, Janet.M.Delaney@uscg.mil
(Regina.ElliottDougherty@uscg.mil, Janet.M.Delaney@uscg.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- USCG STA SAN FRANCISCO (45770) FY26 DRYDOCK REPAIRS NOTE: ALL AMENDMENTS MUST BE SIGNED AND SENT IN WITH PROPSALS. AMENDMENT: A00003: This amendment A00003 is to answer RFC questions for vessel 70Z04026QSBPL0005 USCG SAN FANCISCO (45770) D-031 Fendering System, Repair: Question: The Specs say to use the kit to repair the area noted in Table 1, but there is no Table 1 on the spec. Please let us know which section of the fender will be repaired and provide a picture if possible. Answer: Though Table 1 is mentioned in paragraph 3.2 for repair, the Contractor should follow the overall Intent of the Work Item which states: 1.1 Intent. This work item describes the requirements for the Contractor to repair areas in the fendering system at the COR�s discretion. This will be determined once the CG Representative (COR) is onsite with the Contractor on this work item. The Contractor is more than welcome to conduct a site visit of the vessel prior to submitting any documentation if they choose.2 2.D-032 Fender System, Renew: Question: The specs are duplicative between D-004, D-020, D-031, and D-032. -Do you want us to include all the fender faying preservation on D-020 & D-032? Answer: Work Item D-020 FENDER FAYING SURFACES, PRESERVE, 100 PERCENT is for the Contractor to preserve fender faying surfaces in its entirety to include all the miscellaneous parts associated within. As the intent states: 1.1 Intent. This work item describes the requirements for the Contractor to preserve the fender faying surfaces to include fender strake, fender flat bar, and fender stops. This is for the entire fender faying system. 3.Do you want us to include removals and installations on both D-004 & D-032? Answer: Given the fact that Work Item D-004 requires the Contractor to remove all the fenders to provide an adequate inspection, all fenders will have to be removed. Work Item D-032: Fender System, Renew calls out sections of the system to be renewed. Stating that, all fenders have to be removed and installed in accordance with Work Item D-004. Only three of those Fendering sections will be replaced with new fenders in accordance with Work Item D-032. A00002: AMENDMENT A00002 for 70Z04026QSBPL0005 for the USCG STA SAN FRANCISCO (45770) FY26 DD This amendment is being issued to allow the USCG to respond to Request for Clarification received. As of 11 March 2026, 2:00pm EST, no more Request for Clarification will be accepted. An Amendment will be posted on 16 March 2026 in response to the Request for Clarification received. As a result of the above the new closing date is scheduled for 26 MARCH 2026. A000001 This amendment A00001 is to answer RFC questions for vessel USCG SAN FANCISCO (45770) QUESTION: Work Item D?15, Standard Hose, Renew. The specification lists the Government?Furnished Property as a parts kit: Hose Assembly NSN 4720?01?679?1782 / P/N 45?RB?M?505?101. Please confirm what is included in this kit? Specifically, does it contain everything required to complete the hose renewal, or will the contractor need to purchase any additional materials or components to perform the work? ANSWER: All hoses necessary to complete the work associated with Work Item D-015: Standard Hoses, Renew are included in the kit. The kit contains the hoses (completely built) only! All other consumables if needed (i.e. petrolatum-based tape, chaffing gear) as outlined in the work item shall be procured by the Contractor. QUESTION: How do you want me to submit the bid, I do not see a boiler plate included with the documents. Answer: Please submit your proposal in accordance to Schedule of Supplies and Service and specification service according to SPE REV-0, 22 JANURARY 2026. ------------------------- Combined Synopsis/ Solicitation 70Z04026QSBPL0005, Specification package Rev-0, dated 22 JANUARY 2026 Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download. The Period of Performance POP is 08 JULY 2026 TO 06 OCTOBER 2026 This availability is a Ninety (90) calendar day(s) availability
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/0efc0af9f5dc478193577b05c2610074/view)
- Record
- SN07747515-F 20260319/260317230042 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |